TB Canal work to start soon. From The Gleaner.

Treasure Beach Forum: TB Runnin's: TB Canal work to start soon. From The Gleaner.
Top of pagePrevious messageNext messageBottom of page Link to this message  By jeannie_brim on Wednesday, October 31, 2007 - 03:06 pm: Edit Post

Work resumption on Treasure Beach canal to start soon
published: Wednesday | October 31, 2007

Tashieka Mair, Gleaner Writer

WESTERN BUREAU:

Residents of Treasure Beach in St. Elizabeth, who have had to deal with flooding since the passage of Hurricane Wilma, may soon get relief as work is expected to resume on a canal being built in the community.

Some activity is expected within the next two to three weeks as there are plans to build a $9 million box culvert at Mar Blue.

During a tour of the area on Friday, chief executive officer of the National Works Agency (NWA), Milton Hodelin, said his team had subjected the area, which acts as a catchment for water coming from the Santa Cruz Mountains, to a hydrological study.

Recommendations presented

"The results and recommendations were presented to National Environment and Planning Agency (NEPA) to look at the environmental impact of what we proposed," Mr. Hodelin said.

He was in the company of Minister of Transport and Works, Mike Henry; Member of Parlia-ment for South West St. Elizabeth, Dr. Christopher Tufton, and other NWA representatives.

To date, $21 million has been spent on the project that has an estimated cost of $70 million. The project, which started in April 2006, was abandoned due to the lack of funding. The outstanding work includes paving and fencing the canal.

Mr. Hodelin added that his agency had consultation with the Water Resources Authority, which concurred that building the canal at the proposed size of 30 feet was the most economical solution to provide some relief for the residents.

He informed the residents that a structure would be placed at the top of the canal that would prevent debris from entering the canal and eventually ending up in the sea.

Resident Deta Campbell said she had been unable to move back to her home since it was flooded during Hurricane Wilma and begged the authorities to expedite the project.

"This is one of the things I have been handed down ... I should have been briefed on the magnitude of a problem like this. Obviously, based on what I have heard, this thing needs a more in-depth analysis," Minister Henry told the gathering.


Top of pagePrevious messageNext messageBottom of page Link to this message  By alice on Thursday, November 01, 2007 - 04:54 pm: Edit Post

The last sentence of the article..."this thing needs a more in-depth analysis",... I sincerely hope that this doesn't equate to further studies and delays. Nowhere in the article is there a committed date for the resumption of work on the canal, nor a projected conclusion date. Although I don't like being pessimisstic, this sounds more like rhetoric. My mom always says, "A promise is a comfort to a foul". People who are affected by this thus far engineering debacle should press for concrete info, not more vagueness.